Projects
Nowergup Traction Power Upgrade 2023 -2024
Client: NEWest Alliance
FORSA were awarded the civil and electrical package to upgrade Nowergup substation, transforming it from single-transformer configuration to a two-transformer setup to cater to the demands of the new 14-kilometer dual-track railway extension from Butler station to three new stations culminating at Yanchep station. Scope of Works included;
132kV & 25kV Substation Bay:
- Installation of all 132kV and 25kV equipment, including Voltage Transformers (VTs) and VT marshalling boxes.
- Installation of 132kV and 25kV aerials, from cable sealing ends to the 25kV disconnector.
- Erection of lighting and lightning masts, complete with lighting fixtures and power outlets.
- Installation and termination of MV, protection, control, and LV cables as per the project’s cable schedules.
- Supply and installation of necessary glands, shrouds, and materials to complete all cable terminations.
- Installation of the earth grid, including earth rods, risers, and primary plant earthing.
Feeder & Return Current Cabling to OLE (Rail Corridor):
- Installation of feeder and return cables from the 25kV switchgear and return current cubicle to the OLE isolators and trackside return earth bars (TREBs), including terminations.
Feeder Station Building:
- Installation of small power and lighting systems in the basement.
- Installation of cable ladders in the feeder station basement as per design requirements.
- Termination of MV, protection, control, and LV cables.
- Supply and installation of all materials needed for cable terminations, including glands and shrouds.
- Installation of all earthing components, including the earth grid, rods, risers, and fence earthing.
- Installation of the site main switchboard and connections to the Western Power supply transformer.
- Installation of the site isolation transformer, connecting it to the main switchboard and feeder station.
Splendid Park – Installation & Commissioning of Floodlighting 2023 - 2024
Client: Wanneroo Council
This project has been funded under the Australian Government’s Local Roads & Community Infrastructure Program – Phase 3.
The Splendid Park upgrade floodlighting project was made possible through $420,000 funding from the Australian Government through the Local Roads and Community Infrastructure Program.
FSC Ion were awarded a Contract for the installation & commissioning of floodlighting at splendid park Yanchep. The works involved removing the old floodlighting system and installing 8 new flood lights and switch board.
Beckenham Traction Power Upgrade 2024
FORSA were recently awarded a second substation upgrade from our repeat client, NEWest Alliance. Scope of Works included;
132kV & 25kV Substation Bay:
- Installation of all 132kV and 25kV equipment, including Voltage Transformers (VTs) and VT marshalling boxes.
- Installation of 132kV and 25kV aerials, from cable sealing ends to the 25kV disconnector.
- Erection of lighting and lightning masts, complete with lighting fixtures and power outlets.
- Installation and termination of MV, protection, control, and LV cables as per the project’s cable schedules.
- Supply and installation of necessary glands, shrouds, and materials to complete all cable terminations.
- Installation of infrastructure and equipment
- Installation of the earth grid, including earth rods, risers, and primary plant earthing.
- Construction and installation of the feeder station building.
- Installation of small power and lighting systems in the basement.
- Installation of cable ladders in the feeder station basement as per design requirements. Termination of MV, protection, control, and LV cables.
- Supply and installation of all materials needed for cable terminations, including glands and shrouds.
- Installation of all earthing components, including the earth grid, rods, risers, and fence earthing.
- Installation of the site main switchboard and connections to the Western Power supply transformer.
- Installation of the site isolation transformer, connecting it to the main switchboard and feeder station.
- Installation of feeder and return cables from the 25kV switchgear and return current cubicle to the OLE isolators and trackside return earth bars (TREBs), including terminations.
Trackside Return Earth Bars (TREB) Installation:
- Supply and installation of TREBs in the rail corridor.
Ranford Rd PSP Street Lighting & Electrical 2024
FORSA is proud to be part of the exciting new Ranford Rd train station development for Newest Alliance and Main Roads WA. We’re delivering a comprehensive lighting solution to enhance safety and user experience.
- Installation of Street & Bridge Underpass Lighting: Scope involves the supply, installation and commissioning of 20 light poles, mounted on reinforced concrete pile footings.
- Distribution Board: Scope involves the manufacture, supply and installation of MRWA approved Site Main Switch Board and Lighting Control Panel
- Lighting and power upgrades
Temporary Lighting Byford Rail Extension 2024
Client: Laing O’Rourke
FORSA has been awarded a temporary lighting package to enhance visibility for night shift crews working on the Byford Rail Extension project. This crucial initiative will ensure that the team can execute their tasks safely and efficiently during nighttime operations, minimising delays and maximising productivity. By providing adequate illumination, FORSA is playing a vital role in supporting the timely progression of this iconic infrastructure project, ultimately contributing to the successful delivery of enhanced rail services for the community.